Push Piers Bay Area
Bay Area Underpinning is the name you need to know when you need a foundation repair. We use
ECP Steel Pier technology, which allows us to stay at the top of our game and keep your home on top of its stable foundation. The Model 300 steel piering system has become a standard in underpinning repairs. It will allow your home to rest on a stable footing and hold up to its proper load bearing standards. The design of the pier drives deep into the soil to support structures from the interior and exterior of the foundation. It bypasses all of the active soils to do so. It is the leader of steel piering systems and is quickly becoming well known for being the strongest and deepest driving pier system around.
This is a two-step system that drives the steel pierings to a verified bearing stratum. When it reaches the load bearing soils, the hydraulic lifting system is then put into play and your foundation is restored to its appropriate elevation and will once again provide the stability to give you peace of mind for your home.
This pier is an end-bearing pier, which means that it does not rely on any type of friction to produce the support that it is installed for. All piers are load tested before being installed to assure that they meet all standards and will produce the type of support needed for the repair. This ensures maximum weight can and will be supported during and after restoration and load transfer.
Each pier is individually driven while the entire structure is restored as a reaction. There is a friction reduction collar that is attached to the lead section of the pier pipe to allow for an opening in the soil to be created, which in turn reduces the friction and allows for the installer to load test the pier and verify when a
firm rock or stratum is reached for maximum stability. High pressure jacks are attached in many locations and maneuvered by a hydraulic manifold. This reduces the load on the individual piers and only allows for the designed working load to be transferred to each pier.
• Ultimate Capacity – 79,000 lb
• Maximum Field Test Load – 59,000 lb
• 68 Square Inches Bearing Surface
• Standard Lift – 4”
• Fully Adjustable Unlimited Lift Capability
• Installs From Outside or Inside Structure
• Friction Reduction Collar On Lead Pier Section
• 2-7/8”Diameter High Strength, Galvanized Tubular Pier
• Installs With Portable Equipment
• Installed With Little or No Vibration
• Installs To Rock or Verified Load Bearing Stratum
• 100% of Piers Field Load Tested During Installation
• Manufacturer's Warranty
Foundation Push Pier Installation Sequence
ECP Concentric Pier
|